How long does it take to 3D print a house?
July 15, 2025
|By Diego Villa
The time and material required for printing depend on several variables. For example, constructing a wall with a perimeter of 25 meters, a thickness of 50 centimeters, and a height of 3 meters typically takes around 10 days of continuous machine operation. This process consumes approximately 15 to 20 cubic meters of material, depending on the specific mixture and environmental conditions.